STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects

India’s construction industry is rapidly evolving. With stricter environmental regulations, water scarcity, and compliance requirements, installing a Sewage Treatment Plant (STP) is no longer optional for builders β€” it is mandatory under EC and MPCB Sewage Water Treatment Plant norms.

But the biggest question every builder asks is:

πŸ‘‰ β€œWhat is the total cost of an STP β€” CAPEX + OPEX β€” for my project?”

This comprehensive STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects answers exactly that.

As Green Planet Solutions Pune, we’ve designed, installed, and maintained STPs for hundreds of construction projects across India. This guide is built specifically to help builders, architects, PMC consultants, hotel owners, and industrial clients budget accurately and avoid hidden costs.


πŸ’° 1. Understanding STP CAPEX: Capital Expenditure Breakdown

STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects

CAPEX includes one-time costs required to build and commission the STP.
Below is a typical cost breakup for Indian projects (2025 updated):

βœ” 1. Civil Construction Costs (30–45%)

Civil cost varies based on STP type:

  • MBBR (Moving Bed Biofilm Reactor) – compact, economical
  • SBR (Sequencing Batch Reactor) – higher civil area
  • MBR (Membrane Bio-Reactor) – high civil + membrane cost
  • Johkasou Technology – minimal civil work, higher unit cost

πŸ‘‰ image-alt: STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects – civil construction cost chart


βœ” 2. Mechanical & Electrical Equipment (40–55%)

This includes:

  • Aeration systems
  • Blowers
  • Pumps
  • MBBR media
  • Control panels
  • Diffusers
  • Membranes (for MBR)
  • Storage tanks

MBBR has the lowest equipment cost compared to SBR & MBR.


βœ” 3. Installation, Fabrication & Commissioning (10–15%)

This includes:

  • Piping
  • Cabling
  • Electrical integration
  • Testing
  • Trial run

ENQUIRE NOW FOR STP – https://share.hsforms.com/1d12AT_oJScm8iiXbjSrEIwrh2r7


βœ” 4. Engineering Approvals & Consultancy (5–10%)

Cost includes:

  • EC approvals
  • MPCB documentation
  • Design & process calculation
  • Environmental engineering fees

πŸ“Œ Typical CAPEX Cost Estimate (Indian Market Rates 2025)

STP TechnologyCost per KLD (β‚Ή)Ideal For
MBBR STPβ‚Ή18,000 – β‚Ή28,000Large housing + commercial
SBR STPβ‚Ή22,000 – β‚Ή32,000Medium-large projects
MBR STPβ‚Ή35,000 – β‚Ή65,000Premium projects & hotels
Johkasouβ‚Ή50,000 – β‚Ή120,000Villas, small buildings

⚑ 2. Understanding STP OPEX: Running Cost Breakdown

STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects

OPEX = Monthly cost to operate & maintain the STP.

βœ” A. Electricity Cost (35–50%)

Includes:

  • Blowers
  • Pumps
  • Motors
  • Panel board

MBBR has the lowest power consumption.


βœ” B. Manpower Cost (25–35%)

STP operator charges depend on:

  • Plant size
  • Technology
  • Hours of attendance

βœ” C. Chemicals & Consumables (10–20%)

For:

  • pH adjustment
  • Chlorination
  • Polyelectrolytes
  • Membrane cleaning (MBR only)

βœ” D. AMC & Routine Maintenance (10–15%)

Annual maintenance ensures:


πŸ“Œ Typical Monthly OPEX Estimate for 100 KLD STP

TechnologyOPEX / Month (β‚Ή)
MBBRβ‚Ή25,000 – β‚Ή40,000
SBRβ‚Ή35,000 – β‚Ή55,000
MBRβ‚Ή60,000 – β‚Ή1,20,000
Johkasouβ‚Ή8,000 – β‚Ή20,000

πŸ‘‰ image-alt: STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects – OPEX cost analysis graph


♻️ 3. Why CAPEX + OPEX Must Be Calculated Together

STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects

Builders often make the mistake of choosing a low-CAPEX plant, but later suffer from high OPEX.
The right approach is:

πŸ‘‰ Choose a technology that balances CAPEX + OPEX + Compliance.

This is why MBBR is the top choice in India β€” affordable, stable, and low OPEX.

ENQUIRE NOW FOR STP – https://share.hsforms.com/1d12AT_oJScm8iiXbjSrEIwrh2r7


πŸ§ͺ 4. STP Technology Comparison Based on CAPEX + OPEX

STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects

TechnologyCAPEXOPEXBest For
MBBRLowLowMost projects
SBRMediumMediumMedium-sized projects
MBRHighHighestPremium projects
JohkasouHigh (per KLD)LowSmall individual units

πŸ‘‰ SBR needs cycle management
πŸ‘‰ MBR needs membrane replacement
πŸ‘‰ Johkasou is ideal only for small loads


🌍 5. Compliance Costs: EC & MPCB Sewage Water Treatment Plant Requirements

STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects

Compliance costs include:

  • Sampling & lab testing
  • Flow meters
  • Online monitoring devices (if required)
  • Data logging systems
  • Compliance documentation

Projects failing to meet norms face:
❌ Heavy penalties
❌ OC delays
❌ Legal notices

ENQUIRE NOW FOR STP – https://share.hsforms.com/1d12AT_oJScm8iiXbjSrEIwrh2r7


🌿 6. Treated Water Reuse = Huge Savings for Builders & Societies

STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects

Treated water can be reused for:

  • Flushing
  • Gardening
  • HVAC
  • Car washing

This reduces freshwater consumption & saves β‚Ή50,000 – β‚Ή3,00,000 monthly for societies.

This also ensures full Liquid Waste Management: Wastewater Treatment compliance.


πŸ› οΈ 7. Hidden Costs Builders Must Consider

STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects

  • Sludge dewatering
  • Backup electricity
  • Odour control units
  • Pipe rerouting
  • Operator cabin
  • AMC after 1st year

Planning early avoids cost escalation.


πŸ† 8. Why Choose Green Planet Solutions Pune?

STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects

We deliver:
βœ” MBBR, SBR, MBR & Johkasou STP solutions
βœ” EC/MPCB-compliant designs
βœ” Zero-odour, low-maintenance plants
βœ” Complete CAPEX + OPEX modeling
βœ” Turnkey installation
βœ” AMC & Annual service

πŸ‘‰ image-alt: STP Cost Calculator Guide: STP CAPEX + OPEX for New Projects – Green Planet Solutions Pune STP team

ENQUIRE NOW FOR STP – https://share.hsforms.com/1d12AT_oJScm8iiXbjSrEIwrh2r7


πŸ“ž Ready to Calculate STP Cost for Your Project?

Green Planet Solutions Pune provides free STP costing, design & compliance guidance.